Performance Based Remediation
EMR is conducting remedial investigations, underground storage tank closures, geophysical surveys, Corrective Action Plans, site remediation, long-term monitoring, and developing optimized exit [...]
Long-Term Groundwater Monitoring and Analysis of Multiple Sites
Long-Term Groundwater Monitoring and Analysis of Multiple Sites
Remediation and Monitoring of Groundwater Contaminated with TNT and RDX
EMR was contracted to conduct weekly and monthly O&M of the existing groundwater pump and treat system designed to provide hydraulic containment of a large TNT and RDX groundwater plume by [...]
Performance Based Remediation, Long-Term Monitoring and Groundwater Sampling at OU-2, OU-3 and OU-5
EMR is managing a task order for OU-5 remedial investigation, OU-3 annual monitoring, and OU-2 long-term monitoring. The scope of work includes installation restoration sites that fall under the [...]
Remedial Design and Remediation of Petroleum Contaminated Soil and Groundwater
EMR completed an expedited site assessment, using real-time data acquisition technology (membrane interface probe (MIP) and laser-induced fluorescence (LIF)), as part of a Triad approach program [...]
Remediation of Petroleum Contaminated Soil and Groundwater
EMR completed a remedial investigation, feasibility study, remediation pilot study, corrective action plan, and an installation of an air sparging/soil vapor extraction remediation system [...]
Landfill No. 5 Relocation
The project consisted of the relocation of Landfill No. 5, a 3.4-acre, six-foot deep historic landfill located within the boundaries of Fort Sill near Geronimo Elementary School near Lawton, Oklahoma.
Hazardous Lead Remediation
Under the RCRA-based state cleanup, this risk-based closure involved planning, sampling, field analysis, soil and groundwater characterization, Geoprobe™, excavation, backfill, survey, [...]
Phase I and Phase II Shallow Soils Remediation
A 27-acre property owned by a Class I Railroad was impacted by the operation of a nearby former smelter facility and became contaminated with cadmium and zinc.